Testing

Following gives a brief idea that BDE Switchgears is how strict about their Panels testing:

 

  • Primary Current Injection machine up to 3200A
  • Insulation with 1000V Megger
  • High Voltage Test at 2.5kV for 1 sec. (50Hz)
  • Functional Test
  • Elcometer- Powder Coating quality (1000hr and scratch etc.)
  • A.C. Variable 0-270Vac
  • Continuity meter
  • Multimeter
  • Phase sequence meter- 3phase
  • Verner Calliper
  • Screw Guage